Home WMS Control GIS FSM PBW Pricing Security Knowledge base
WSP module

Risk assessment in which every number has a source

A water safety plan run on data the utility already holds

The Act of 13 March 2026 requires risk assessments in three layers, but does not say how to score them. WSP takes the utility from gathering data, through the assessment workshop and the validator, to an approved document, a link for the authority and ongoing supervision.

Free consultation
Deadlines from the amending act (Journal of Laws 2026 item 605, art. 7 and 9). After that, a review at least every 6 years.
21.05.2026
Act in force
Chapter 1a of the Collective Water Supply Act: a risk-based approach from the catchment to the tap.
31.12.2026
Catchment assessment
To the director of the Regional Water Management Board (RZGW) and the district sanitary inspector.
30.06.2028
Supply system assessment
To the Sanitary Inspectorate. On the same date, the assessment of priority premises, carried out by their manager.
Every 6 years
Documented review
An update is submitted within 30 days. Late filing: PLN 10 per day, for up to 365 days.

Three problems we solve

The obligation is new, there is no official methodology, and the data sits in several departments.

The law says what, but not how

The act requires the assessment to rest on standards, but imposes no scale. Of the seven jurisdictions reviewed, no two score risk the same way. WSP ships ready methodologies with a note on when to use which.

A spreadsheet will not answer the authority

Where did the number come from, when was the source read, and who signed it off? In WSP every P and C score records its rationale, every register item its read date, and every approved document a SHA-256 digest.

The data exists, just in five places

Well records, permits, test results, protection zones and public registers. Once an assessment is opened, the system assembles everything that can be derived and names what cannot.

What the act requires

Three assessments, each with its own article, object, addressee and deadline. Water flows from left to right, and responsibility moves with it.

art. 4f

Intake catchment

Object: the intake, the catchment and the wells
Carried out by: the water supplier
Submitted to: the RZGW director and the district sanitary inspector
First deadline: 31.12.2026
art. 4g

Supply system

Object: treatment plants, reservoirs, network
Carried out by: the water supplier
Submitted to: the district sanitary inspector (and RZGW on updates)
First deadline: 30.06.2028
art. 4i

Internal plumbing

Object: priority premises, more than 50 people a day (art. 4j)
Carried out by: the owner or manager of the premises
Submitted to: the district sanitary inspector
First deadline: 30.06.2028
Worth knowing

The phrase "water safety plan" does not appear in the act

The act requires risk assessments. WSP is how we organise everything that leads to them and follows from them: the assessments, analyses under art. 133 of the Water Law, protection zones, the monitoring programme and incidents. The authority receives an assessment with a summary report, not a plan.

Worth knowing

The authority receives the assessment, it does not approve it

There is no approval procedure and no procedure for agreeing a methodology. RZGW and the Sanitary Inspectorate act on the basis of the assessment: towards polluters, when consenting to less frequent testing, and for additional testing. The art. 133 Water Law intake risk analysis is a separate instrument that the assessment must take into account.

How we score risk

A three-step cascade in the default ASTEE methodology. Three of the four inputs come from data rather than opinion, and every step can be defended on its own.

P · likelihoodchosen by the operator
C · severityfrom the parameter class
V · overburden protectionthe Hölting method
E · measure effectivenessfrom validation
Only the engine computes the result
1 · initial P × C, at the point of the event32
2 · raw water × V, at the intake32
3 · residual ÷ E, after control measures32
Risk levelDUŻEthresholds <8 · 8–15 · ≥16

Try it: P = 2, C = 16 gives 32 and a HIGH level. A control measure with validation at E = 4 brings the result down to 8, a MEDIUM level. A documented review of the measure (E = 12) lowers it three times further than a measure that merely works.

The methodology is data, not code

ASTEE, WHO, DVGW W 1004 and the art. 133 model are dictionary rows. An approved methodology cannot be edited, and every item holds a frozen copy of it. If a regulation arrives with its own scoring, it becomes one more row.

Two axes of consequence

Water quality and continuity of supply: from no impact to an outage longer than 48 hours. The engine takes the worse of the two, so a failure that poisons nobody but cuts off a district for three days also carries weight.

Hydrogeology nobody else computes

The overburden protection class from the lithological profile (Hölting, NRW 2008 variant). None of the state or commercial tools reviewed computes this step. A person enters the layer profile, and the calculation is stored with the item as evidence.

From data to a document at the authority

Five stages of the method, each anchored to a point of the article. For the catchment layer that is art. 4f(2); for the other layers the generator selects the right provision.

01points 1–2

Catchment

A description of the intake, the catchment, the hydrogeology and land use.

02point 3

Hazards

Sources, hazards and hazardous events, placed on the map.

03point 3

Risk

P × C scoring, the cascade and the levels. The act merges this point with hazard identification.

04point 4

Measures

Control measures with effectiveness validation, a responsible person and a deadline.

05point 5

Monitoring programme

Operational and compliance monitoring, with a justification for every item.

Data readiness gate

The workshop opens only once the materials checklist is closed. Every point is present, deliberately skipped with a reason, or missing, with a place to fill it in.

Validator: 16 rules

Each one sourced from the WHO QA Tool, the LAWA checklists or the Finnish model. Missing rationale for P or C, or a significant risk with no action and deadline, blocks approval.

Four eyes and a verifiable signature

Approval comes from a second administrator in your organisation, other than the author. The system records who, when, and the SHA-256 digest of the approved document.

A link for the authority instead of an email

The authority reads the assessment without creating an account, through a link valid for 1 to 90 days. Every visit is logged, and the digest for verification sits next to the signature.

Supervision after filing

An incident creates a review at the same moment, with a 30-day deadline. Statutory deadlines, revalidations and overdue monitoring raise reminders on their own, starting 365 days ahead.

What you do, and what you do not have to

The substantive work is done by the utility, in the portal. That way the assessment is yours, and the module is not waiting on anyone else's capacity.

You do it yourself in the portal
-Fill in only the points no register knows
-Mark hazards known from the field and place them on the map, with evidence
-Choose P and C from the methodology scale and record the rationale
-Describe control measures and answer the validation questions
-Build the monitoring programme with a justification for each item
-Approve the document with a second pair of eyes and issue a link to the authority
You do not have to at all
-Retype well records, permits, zones and testing history
-Compute specific capacity q = Q/s, it follows from the pumping tests
-Search public registers: SEVESO, E-PRTR, mining areas, flood zones
-Invent a hazard catalogue: the starter library holds 2,082 entries
-Work out E: it follows from the validation answers
-Format the document and keep track of review deadlines

Where we take the data from

Three mechanisms on different cycles. Data is narrowed to the extent of the object being assessed, and then a person accepts every row. Nothing is saved on its own.

Internal

Registers you already keep

Well records, pumping tests, water permits, zone decisions and five years of quality history per parameter. This is where we have an edge: a tool without access to operations starts from a blank page.

Weekly

12 pressure layers

SEVESO and E-PRTR (Chief Inspectorate of Environmental Protection), BDOT10k (Head Office of Geodesy and Cartography), MIDAS mining areas and deposits, CLC 2018, PSH abstractions and boreholes from the HYDRO Bank. Sector rules turn them into scored candidate items for the assessment.

At the intake, on demand

3 point lookups

ISOK flood hazard maps, the groundwater body and nature protection forms from the General Directorate for Environmental Protection. The result belongs to the intake, and the assessment carries a copy with its read date, so the document can be reproduced.

Missing data never looks like zero. The sources panel has a third category, unavailable, and an empty exceedance register is not presented as compliance.

Who WSP is for

Those accountable for water quality

Process engineers and intake managers who run the assessment: they identify hazards, score risk and describe control measures using data from their own operations.

Technical management

The approver, who needs confidence that they are signing complete, validated work, and who sees the deadlines for every layer in one calendar.

The utility's board

Accountable to RZGW and the Sanitary Inspectorate. They receive a document that answers the authority's question of where the number came from, plus a record of who read it and when.

What we do not promise today

Better to name the gap than to guess at it. We say these things before an implementation, not after.

Internal plumbing assessment in priority premisesThe written form, signature and qualifications under art. 4i and 4l are not supported. The signature is made outside the system.
Exemption for small suppliersThe exemption under art. 4g(15) (up to 500 people or below 100 m³/day) is not taken into account today.
Letters to the authority after a reviewA review with no changes is recorded, but the system does not draft a notice of no update or an application for less frequent testing.
Zone boundaries from Polish WatersNobody publishes them in machine-readable form. We generate an application to SIGW, and a person redraws the boundary of the area.
AI will not write the assessmentThe model may propose a row; a person accepts or rejects it. By default this feature is switched off.
P from the number of exceedancesEvent frequency is not the count of bad results. We deliberately do not make that mapping.

Four things we hear before a WSP decision

Answers without waiting for a sales conversation.

"There is no regulation, so we will wait"

No methodology is not the same as no obligation. The 31 December 2026 deadline does not depend on guidance, and waiting only shortens the time left for the work. If a regulation imposes its own scoring, for us that is a new methodology, and an assessment made today keeps the one it used.

"We will do it ourselves in Excel"

You can, right up to the authority's question of where the number came from, when the source was read and who signed it. A spreadsheet will not freeze the methodology, will not force a rationale and will not give a verifiable signature. And the cycle is three layers times the number of objects, every six years.

"We already have a WSP from 2016"

An excellent starting point for the catchment description and the hazard catalogue. But it was written to WHO edition 1, before the current act: without the three layers, the anchors to art. 4f, 4g and 4i, or scoring that can be reproduced.

"Will you do it for us?"

No. The act says the assessment is made by the water supplier, and the supplier is accountable for it. We provide the tool, the data, the methodology and the validator, and we take configuration and training on ourselves.

Frequently asked questions

Is a water safety plan a statutory obligation?
No. The Act of 13 March 2026 (Journal of Laws 2026 item 605) requires the risk assessments under art. 4f, 4g and 4i, and the words "water safety plan" do not appear in it. WSP in HydroNexis is an umbrella plan that gathers the assessments and the related registers, computes completeness and raises the review reminder. What goes to the authority is the assessment together with a summary report.
How does the assessment differ from the art. 133 Water Law intake risk analysis?
They are two instruments: the art. 133 Water Law analysis runs on a 10- or 20-year cycle and goes to the voivode, while the art. 4f assessment runs on a 6-year cycle and goes to RZGW and the Sanitary Inspectorate. The assessment must take the analysis into account (art. 4f(1)(5)), but it is not that analysis. In WSP the analysis and the protection zones feed the hydrogeological description.
Does the utility assess the plumbing in a hospital or a school?
No. The assessment of the internal water system of priority premises is carried out by its owner or manager (art. 4i). Priority premises are non-residential buildings in which more than 50 people a day are exposed to water-related risk (art. 4j(1)). That assessment requires a written form with a signature and the assessor's qualifications, which the system does not support today.
Which methodology do you use, and is it agreed with the authority?
By default the French ASTEE, with the German V protection step. WHO, DVGW W 1004 and the art. 133 model are also available. The act imposes no scale; it requires a basis in standards (art. 4e(3)), in practice PN-EN 15975-2. There is no procedure for agreeing a methodology with the authority, which is why we do not call it "agreed" or "certified".
How does the authority receive the document?
An administrator issues a time-limited link, valid for 1 to 90 days (30 by default). The authority reads the approved assessment and the document without creating an account. Every visit is logged, and next to the signature sits a SHA-256 digest the authority can use to confirm it has the same bytes that were signed. Only an approved assessment can be shared.
How much work will this be for our team?
We will not give a single number, because the spread is wide. It depends on the number of intakes, treatment plants and priority premises, how complete the digital well records are, the hydrogeological documentation and the water survey, and whether the art. 133 analysis is current. With complete well records, most of the first stage assembles itself.
Scan with your phone

Materials and contact at hand

The code opens the page directly on your phone. You will find the same set at our trade fair stand.

Book a free consultation
Contact form, takes 30 seconds to complete
Kod QR: Umów bezpłatną konsultację
hydronexis.pl/demo
Platform catalogue 2026
PDF: five modules, implementation, data security
Kod QR: Katalog platformy 2026
hydronexis.pl/katalog
Team contact card
Contact details for the people you are speaking with
Kod QR: Wizytówka zespołu
hydronexis.pl/kontakt
Next step

We start with one intake

In the call we check how much of the first stage will assemble itself at your utility, and what is missing before the 31 December 2026 deadline. We run the pilot on one intake and the catchment layer.

Questions we will ask in the call
01How many intakes, treatment plants and priority premises do you have in the municipality?
02Are the well records digital, and are they complete?
03Do you have the hydrogeological documentation, the water survey and the art. 133 analysis?
04Where are the test results: in a system, or in PDFs from the laboratory?
05Who will author the assessment, and who will approve it?

Leave your details and we will call back

Not sure which module would suit you best? We will work it out in a short call. Two fields, and we settle the rest by phone.

We call back within 24 hours on business days. Consent can be withdrawn at any time by writing to biuro@hydronexis.pl. We do not sign anyone up to a newsletter.

Prefer to call? +48 662 640 450 biuro@hydronexis.pl Mon-Fri, 8:00-16:00